
Bangalore Metro Rail Corporation Limited (BMRCL) is racing against time to fix the missing links at Beniganahalli on Old Madras Road and at Challaghatta on Mysuru Road, and is optimistic of making the Purple Line fully operational by August.
https://ift.tt/bB549K6